Skip to content
Construction Progress Monitoring: Sample of Website Deliverables
Construction Progress Monitoring: Sample of Website Deliverables

  • Home
  • Construction Progress Posts
    • Site Imagery 9/21/23
    • Site Imagery 10-01-23
    • Site Imagery 10-07-23
  • About
  • FAQ
Construction Progress Monitoring: Sample of Website Deliverables

Site Imagery 9/21/23

Imagery captured on 09-21-23 between 5PM and 5:30PM, overcast.

Every progress flight performed will have its own page created just like the one you see here. Each flight page will display imagery from the flight in an easy to view format.

Depending on the tier level of service being flown, customers may only see still photos, or stills and video, or stills, video, and orthomosaics. The imagery displayed on the sample pages here all contain automated tier 3 flight deliverables (stills, video, and orthos).

ORTHOMOSAIC

Orthomosaics are a great wat to get the bird’s eye view of a construction area and compare the construction progress between flights. Be sure to check out the orthomosaic from the next flight on 10-1-23.

 

STILLS

Most of the still images are taken from a preprogrammed drone flight. This is done so that the images will capture the same locations around the construction site from the same altitude and position, making it easier to monitor and accurately gauge construction progress from specific scenes between flights. Add on images may be included from time to time. As construction progresses, adjustments to the programmed flights are likely to occur.

Click on any image to for an enlarged view.

1
2
3
4
5

VIDEO

Just like with the still images above, most of the 4K video captured from the construction site is done from a preprogrammed done flight for consistency in viewing between flights. As construction progresses, it may be required to adjust the programmed flights.

 

 

Click Here For: Next Construction Progression Page: 10-01-23

  • Home
  • Construction Progress Posts
    • Site Imagery 9/21/23
    • Site Imagery 10-01-23
    • Site Imagery 10-07-23
  • About
  • FAQ
©2025 Construction Progress Monitoring: Sample of Website Deliverables | WordPress Theme by SuperbThemes